When to Choose Factory assembled cooling Towers vs. Field-Erected
Choose FAP when:
✓ Capacity < 2,000 tons
✓ Quick installation required
✓ Budget is constrained
✓ Space allows modular placement
✓ Standard performance is acceptable
Choose Field-Erected when:
✓ Capacity > 2,000 tons
✓ Extreme durability needed (30+ year life)
✓ Highly corrosive environment
✓ Custom design features required
✓ Space constraints favor vertical design