Blog

ct 20

Field-Erected Cooling Towers

Field-erected cooling towers (FECTs) are large, custom-built cooling systems assembled on-site, designed for heavy-duty industrial applications requiring high heat rejection capacity (typically 500+ tons of cooling). Unlike factory-assembled packaged towers, these are built piece-by-piece at the installation location, allowing for greater customization and scalability.

Key Features & Design Types

1. Construction & Materials

  • Frame:
    • Galvanized steel, stainless steel, or concrete.
  • Fill Media:
    • Film fill (PVC) – High efficiency, prone to fouling.
    • Splash fill (wood or plastic) – Less efficient but more fouling-resistant.
  • Casing:
    • Fiberglass, PVC, or concrete for corrosion resistance.

2. Airflow Configuration

TypeDescriptionPros & Cons
Induced DraftFan at top pulls air upward Better air distribution, Higher fan power
Forced DraftFan at base pushes air in Easier maintenance, Recirculation risk
CrossflowAir flows horizontally, water falls vertically Energy-efficient,  Larger footprint
CounterflowAir flows upward against falling waterCompact, higher efficiency

3. Water Distribution System

  • Gravity-fed basins (for crossflow).
  • Pressurized spray nozzles (for counterflow).

Advantages of Field-Erected Cooling Towers

Customizable – Designed for specific flow rates, temperatures, and space constraints.
High Capacity – Handles thousands of tons of cooling (used in power plants, refineries).
Durable Materials – Resistant to harsh environments (chemical plants, coastal areas).
Long Lifespan – Properly maintained, lasts 20-30+ years.

Disadvantages

Higher Initial Cost – More expensive than packaged towers.
Longer Installation Time – Requires on-site assembly.
Maintenance Complexity – Larger systems need more inspections.

Applications

  • Power plants (nuclear, coal, combined-cycle).
  • Oil & gas refineries.
  • Chemical & petrochemical plants.
  • Steel & paper mills.

Maintenance Requirements

  • Regular fill media cleaning (to prevent scaling & biofilm).
  • Drift eliminator inspection (minimize water loss).
  • Structural integrity checks (concrete/steel corrosion).
  • Water treatment (anti-scaling, biocides).

Comparison: Field-Erected vs. Packaged Cooling Towers

FeatureField-Erected TowerPackaged Tower
Capacity500+ tons< 500 tons
CustomizationHigh (site-specific)Limited (pre-built)
Installation TimeWeeks to monthsDays to weeks
CostHigher upfrontLower upfront
Lifespan20-30+ years15-20 years

Field-erected cooling towers are industrial-grade solutions for massive heat rejection needs, offering customization, durability, and scalability. They are essential for power plants, refineries, and heavy industries where standard packaged towers are insufficient.